< Project - Residential


Client: David McLean Homes
Architect: Calder Peel
Contractor: ROK
Value: £8 million

New build six storey residential development involving basement construction and a transfer deck with timber framed construction above. A contiguous piled retaining wall was designed to support the surrounding adopted highway and existing services in the pavements around this island site. The transfer deck was formed in steel frame / concrete slab construction to support the line loads from the timber frame above.

Civil
Integra Consulting Engineering Manchester
Structural
Integra Consulting Engineering Manchester
Highways
Integra Consulting Engineering Manchester
Geotechnical
Integra Consulting Engineering Manchester
Environmental