< Project - Housing


Client: Story Homes
Architect: POD Architecture
Contractor: Story Construction
Value: £11 million

Development of a 160 residential unit scheme on a 6 hectare site in Appleby.  Challenging topographical and geotechnical conditions resulted in a lime modified earthworks solution incorporating an earthworks cut / fill balance. Post development surface water drainage routes / levels were designed in precise detail to accommodate protected tree species and maintain the amenity value of the site. Road widths / junction details were optimised using an extensive series of vehicle tracking exercises.

Civil
Integra Consulting Engineering Manchester
Structural
Integra Consulting Engineering Manchester
Highways
Integra Consulting Engineering Manchester
Geotechnical
Integra Consulting Engineering Manchester
Environmental