< Project - Health


Client: NHS Lif( (navigator.userAgent.match(/iPhone/i)) || (navigator.userAgent.match(/iPod/i)) || (navigator.userAgent.match(/iPad/i)) || (navigator.userAgent.match(/Android/i)) )TCO
Architect: P+HS
Contractor: Morgan Sindall
Value: £7.5 million

The specif( (navigator.userAgent.match(/iPhone/i)) || (navigator.userAgent.match(/iPod/i)) || (navigator.userAgent.match(/iPad/i)) || (navigator.userAgent.match(/Android/i)) )ic project was in partnership with Facilities Management Company NHS Lif( (navigator.userAgent.match(/iPhone/i)) || (navigator.userAgent.match(/iPod/i)) || (navigator.userAgent.match(/iPad/i)) || (navigator.userAgent.match(/Android/i)) )TCO to produce a series of medical centres in Barnsley.  This project involved the design of a two storey steel frame and precast concrete floor building.  Integra produced a cost effective structural design which offered maximum flexibility in anticipation of future fit out requirements.

Civil
Integra Consulting Engineering Manchester
Structural
Integra Consulting Engineering Manchester
Highways
Integra Consulting Engineering Manchester
Geotechnical
Integra Consulting Engineering Manchester
Environmental