|
|
< Project - Health

Client: NHS Lif( (navigator.userAgent.match(/iPhone/i)) || (navigator.userAgent.match(/iPod/i)) || (navigator.userAgent.match(/iPad/i)) || (navigator.userAgent.match(/Android/i)) )TCO
Architect: P+HS
Contractor: Morgan Sindall
Value: £7.5 million
The specif( (navigator.userAgent.match(/iPhone/i)) || (navigator.userAgent.match(/iPod/i)) || (navigator.userAgent.match(/iPad/i)) || (navigator.userAgent.match(/Android/i)) )ic project was in partnership with Facilities Management Company NHS Lif( (navigator.userAgent.match(/iPhone/i)) || (navigator.userAgent.match(/iPod/i)) || (navigator.userAgent.match(/iPad/i)) || (navigator.userAgent.match(/Android/i)) )TCO to produce a series of medical centres in Barnsley. This project involved the design of a two storey steel frame and precast concrete floor building. Integra produced a cost effective structural design which offered maximum flexibility in anticipation of future fit out requirements.
|
|
|
|
|