|
|
< Project - Health

Client: NHS LIFTCO
Architect: Pearce Bottomley
Contractor: Morgan Sindall
Value: £6.5 million
The specific project was in partnership with Facilities Management Company NHS LIFTCO to produce a series of medical centres in Barnsley. This project involved the design of a two storey steel frame and precast concrete floor building. Integra produced a cost effective structural design which offered maximum flexibility in anticipation of future fit out requirements.
|
|
|
|
|