< Project - Health

Client: NHS Lif( (navigator.userAgent.match(/iPhone/i)) || (navigator.userAgent.match(/iPod/i)) || (navigator.userAgent.match(/iPad/i)) || (navigator.userAgent.match(/Android/i)) )TCO
Architect: Pearce Bottomley
Contractor: Morgan Sindall
Value: £6 million
Integra partnered with Facilities Management Company NHS Lif( (navigator.userAgent.match(/iPhone/i)) || (navigator.userAgent.match(/iPod/i)) || (navigator.userAgent.match(/iPad/i)) || (navigator.userAgent.match(/Android/i)) )TCO to produce a series of medical centres as part of a regeneration programme in Barnsley. This two storey building was formed in a braced structural steelwork frame with precast concrete first floor units - the building design produced a cost effective structural scheme providing maximum flexibility to meet future fit out requirements.
|
|
|
|
|