Integra Consulting Engineering Manchester
< Project - Health


Client: Merepark
Architect: Calder Peel
Contractor: Denton Construction
Value: £900,000

This three storey building was formed utilising loadbearing masonry construction to support precast concrete upper floor construction.  A particular feature of the building was a concrete canopy to the building perimeter.  Integra produced an economic and innovative solution to this potentially costly detail by utilising precast concrete units fixed to a steel hollow section beam. The steelwork was strapped to the masonry wall utilising the masonry dead weight to prevent overturning.

Civil
Integra Consulting Engineering Manchester
Structural
Integra Consulting Engineering Manchester
Highways
Integra Consulting Engineering Manchester
Geotechnical
Integra Consulting Engineering Manchester
Environmental